|
|
Stan Jessup's 'forty something' chief project - Part 1
I started thinking about a new project several months back but I had a space problem to deal with because of an excess brand X bike that was occupying too much real estate in my shop. I went to work on the problem, and eliminated it so that this project could occupy the newly acquired space. I want a good solid rider, which could be used in heavy traffic, and I didn't care if it was "correct" but I'm not a chopper or bobber fan, so it needs to be correct from an "appropriate distance". The primary alteration has to be adding disk braking. I thought about the engine a little, and even considered the Aussie Overhead Valve kit, but the price versus value just didn't seem to make much sense. Then I ran face first into a set of cast aluminum cylinders at a fair price. Hmmmm, now we have something genuinely different and very feasible, so I bought them. Now, you need to realize, these are, for all intent and purpose untested parts, so I have a bit of risk, and trial and error involved to make everything work, but it still appears to be something that should work (famous last words). At this point, I decided that to protect the investment, nothing but top notch parts could go in the lower end, so I inquired about a set of JE forged pistons. I found that since I wanted to make this an 80" engine, it was possible to have pistons made in a flat top design by changing the piston pin location. This would allow for the use of the standard 74" heads, and also cut down on the rocking motion of the pistons in the bore. Seems to be a good fit, so I bit the bullet, and ordered them up with an estimated 8 week delivery. I intend to have this bike together, and all of the details (problems) worked out by the Spring of 2001 since the goal is to use this bike for the 100th anniversary ride to Springfield. The bike needs to be able to cruise at about 65 mph for long periods, be very reliable, comfortable, and safe. I don't want any modifications that can't be returned to their original state, so there won't be any cutting or welding on any major components. I want to use a modified alternator and 12 volt charging with Halogen lighting system, but otherwise, stock electrics. At this point I'm only short one item...... the bike! Time to find a basket Chief to bring back from the grave. I want to use a 46 or later bike, because I think they ride better than the earlier leaf spring front end. Assuming I would be able to find a good 46-48 basket within a short time, everything will come together at about the same point in time. This hasn't proven too difficult, except that (as usual) I live on the left coast, and everything I am interested in is on the wrong coast. The west coast is a beautiful place, but as far as swap meets go, they mainly involve HD parts, and even then, there aren't any big swaps here.
Ok, now I have the basics in motion. I talked with Kiwi, about the new 80" T&O flywheels, and Carrillo style rods, and found that the flywheels are ready, but the rods aren't. No big deal, we'll wait for the rods. I also remembered that they were supposed to have CNC bent stainless exhaust systems available, so naturally we'll have to have a set of those! When a dealer is as helpful as Kiwi, Starklite and Greer have been, I become very faithful to their products, so we'll use anything new here that I actually need for the project so I can get a feel for the quality of any new developments. I'll try to go over any assembly issues with the new products as I move through the process. Some parts are purchased from other sources because I have used the particular part or vendor, and I like how it worked out. Bolts are one such item. The dealers will supply them, but they are the typical hardware store variety, so all bolt kits will come from Ed Glasgow. Besides, Ed's a really nice guy. At a local swap meet, I found a 16" dual disk front wheel assembly for $20.00, and once I do a little machining on the hub, this will take care of the front wheel. Another $20 for a good rotor, and $28 for a repro Indian fender light. Not a bad day for parts scrounging (except for the $10 admission, $7 hamburger and $3 coffee). Now, I need to locate a very small caliper, and master cylinder, which I probably won't find at a local swap meet since in this case, "size does matter". Paint and body work are always an issue! If you don't do your own, you better get all your fitting done early, because I think body guys use some sort of ancient calendar. If they give you the standard 4 week line, plan on 8 weeks! Since I won't have original fenders for this bike, and originally each was hand fit at the factory, I'll need to take care of the fitting fairly early on. I have painted bikes before, but I want a higher quality paint job on this than I have the time or space to provide, so I'll probably farm that out. Since this project isn't going to be a "chrome queen" I won't have a lot of dealings with the other guys that work by mystical calendars (chrome shops). Well, we made it to basket arrival day! I located a set of fenders, so now it's time to take inventory, and figure out what I still need. As usual, the seller was a bit more enthusiastic about what he had, than reality would dictate. Next month, we'll be sorting, inspecting and cleaning parts. Then we start rough fitting things together. Until next month, ride safe, and sane. |
|
Please support us with a paypal donation if you want the site to continue! |